A few weeks ago, our team completed the installation of a 1.5 MW multi-voltage converter at one of our customers’ sites in Spain.
A system designed to handle different voltage levels and types of current, supporting locomotive testing activities.
The installation consists of two containers:
- 40-foot container, housing the converter transformers and output switchgear;
- 45-foot container, housing the electrical and control panels.
The entire system is integrated with ventilation, cooling and SCADA control systems to ensure reliability and performance during testing activities.
Behind every installation are expertise, coordination and people. A big thank you to our team for their commitment and collaboration, which make projects like this possible.
Follow us to discover Irmie Impianti in action, through international projects, on-site work and solutions for the railway industry.